Galvin Engineering Safe-Cell 50150 Manual de instalação do produto - Página 3

Procurar online ou descarregar pdf Manual de instalação do produto para Produto de canalização Galvin Engineering Safe-Cell 50150. Galvin Engineering Safe-Cell 50150 4 páginas. Prison basin set

Galvin Engineering Safe-Cell 50150 Manual de instalação do produto
1. Fit push button & basin outlet
Fit the push button and basin outlet into the bench.
Ensure the sealing o-ring is placed underneath the
push button and outlet body and the anti-rotation pin
locates properly.
Secure underneath with the supplied cup washer and
back nut.
3. Fit flexi hose
Connect water supply to isolation valve inlet.
Version 2, 30 August 2018, 3 of 4
2. Assemble valve body
 Assemble the valve body to the push
button.
 Ensure to apply thread tape for sealing.
Take care not to over-tighten.
4. Testing
 Push the button and ensure that there is
flow from the outlet.
 Inspect the tap and check for any leaks.
 Adjust flow with isolation valve, so
required flow is achieved