Galvin Specialised Ezy-Drink CP-BS TD15EB 제품 설치 매뉴얼 - 페이지 2

{카테고리_이름} Galvin Specialised Ezy-Drink CP-BS TD15EB에 대한 제품 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Specialised Ezy-Drink CP-BS TD15EB 4 페이지. Remote electronic drinking bubbler tap - battery

TOOLS REQUIRED
Power drill
Spanner or adjustable crescent
Screw driver
PRE-INSTALLATION -
If the mounting holes do not already exist, mark out and drill
the holes in the bench/trough, as shown in rough-in
dimensions.
Note: Supplied flexi hose length is 225mm long.
Note: Before installation, all lines must be flushed.
We recommend that a line strainer be installed prior to drinking
taps to eliminate any foreign material.
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
1. Disassemble piezo button and outlet
− Remove backnuts and washers as
shown.
MOUNTING DETAILS
Rough-In Dimensions
2. Fit mouthguard outlet
Fit the body and mouthguard outlet into the trough.
Ensure the sealing rubber washers are placed
underneath the mouthguard outlet body.
Secure underneath with the supplied cup washer and
back nut.
th
Version 1, 16
June, Page 2 of 4