Galvin Specialised Ezy-Drink CP-BS TD15EB 제품 설치 매뉴얼 - 페이지 2
{카테고리_이름} Galvin Specialised Ezy-Drink CP-BS TD15EB에 대한 제품 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Galvin Specialised Ezy-Drink CP-BS TD15EB 4 페이지. Remote electronic drinking bubbler tap - battery
TOOLS REQUIRED
−
Power drill
−
Spanner or adjustable crescent
−
Screw driver
PRE-INSTALLATION -
−
If the mounting holes do not already exist, mark out and drill
the holes in the bench/trough, as shown in rough-in
dimensions.
Note: Supplied flexi hose length is 225mm long.
Note: Before installation, all lines must be flushed.
We recommend that a line strainer be installed prior to drinking
taps to eliminate any foreign material.
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with these
provisions shall void the product warranty and may affect the performance of the product.
1. Disassemble piezo button and outlet
− Remove backnuts and washers as
shown.
MOUNTING DETAILS
Rough-In Dimensions
2. Fit mouthguard outlet
−
Fit the body and mouthguard outlet into the trough.
−
Ensure the sealing rubber washers are placed
underneath the mouthguard outlet body.
−
Secure underneath with the supplied cup washer and
back nut.
th
Version 1, 16
June, Page 2 of 4