CORNING SCF-1728 매뉴얼 - 페이지 3

{카테고리_이름} CORNING SCF-1728에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. CORNING SCF-1728 14 페이지. Heat shrink open ribbon system (hs-ors) canister splice closure

CORNING SCF-1728 매뉴얼
One express (mid-span) cable may be placed in the express port or up to two individual cables may be installed
using the supplied three-finger clip.
Step 1:
Place a wrap of tape around the cable sheath at the distance specified in Figure 2. Remove indicated
length of cable sheath and armor (where applicable) according to cable manufacturer's instructions.
Cable Sheath
TPA-6300
IMPORTANT:
Do not expose the bare fibers until after the cable has been placed in the closure end cap. Do not
untwist the subunits or remove their jacketing.
Step 2:
Pull the outer jacket open to the tape mark (Figure 3). Ring cut about halfway through the GRP rods
and polyethelene jacket. Bend the jacket back.
Step 3:
After jacket is bent back, cut off the jacket and GRP rods (Figure 4). Then remove water-swellable tape
with scissors.
TPA-5939
15 feet of exposed ribbon subunits
TPA-5940
Figure 3
Standard Recommended Procedure 206-455-AEN | Issue 1 | November 2018 | Page 3 of 14
Figure 2
GRP rods
Water-swellable
tape
Figure 4