Fronius TPS 4000 설치 지침 매뉴얼 - 페이지 11

{카테고리_이름} Fronius TPS 4000에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Fronius TPS 4000 20 페이지. Second earthing socket at rear
Fronius TPS 4000에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (20 페이지)

Fronius TPS 4000 설치 지침 매뉴얼
Mounting the se-
cond earthing
(3)
socket at the re-
ar
(1+9)
Mounting the second earthing socket
Threading in the cable
Connecting the cable to the front current socket
(g)
(8)
(2)
(k)
(j)
(i)
(h)
(8)
(3)
Mount the rear (-) current-socket
1
(1), complete with its blanking cap
(9):
-
Insert the rear (-) current-so-
cket (1), working from the out-
side towards the inside
-
Insert insulating washer
-
Screw on the hexagonal nut
-
Tighten the hexagonal nut with
the torque wrench, width 32
-
Thightening torque 35 Nm
IMPORTANT! The recess in the cur-
rent socket must point downwards.
Thread the cable (8) through the
2
rubber lead-throughs (f) and (g)
(f)
Connect the cable to the front cur-
3
rent socket (1):
-
Put the belleville spring was-
her (i) over the hexagon head
Housing
screw (h)
-
Put the star (j) over the hexa-
gon head screw (h)
-
Put the cable lug of the cable
(8) over the hexagon head
screw (h)
-
Put the cable lug of the exis-
ting current cable (k) over the
hexagon head screw (h)
-
Screw the hexagon head screw
(1)
(h) into the current socket
-
Tighten the hexagon head
screw (h) with the torque
wrench, width 19
-
Thighting torque 15 - 35 Nm
11