Kohler K-11344 설치 및 관리 매뉴얼 - 페이지 5
{카테고리_이름} Kohler K-11344에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-11344 45 페이지. Freestanding bath
Kohler K-11344에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (28 페이지), 설치 매뉴얼 (25 페이지), 러프인 매뉴얼 (4 페이지)
Bond in accordance
with applicable codes.
1. Prepare the Site
NOTICE: Measure your product for site preparation. Note the model number located on the
pump/blower end of the bath, then visit the product page at www.kohler.com for more information.
Install an access panel to service the blower motor.
Prepare the routing paths for the PVC piping and keypad cable. Follow all applicable building, fire,
plumbing, and electrical codes.
Carefully unpack and inspect the new bath for damage before installation. If there is damage do not
install the bath; contact your dealer.
Make sure the flooring offers adequate support for the bath, and verify that the subfloor is flat and
level.
Install the rough plumbing.
Determine the location of the bath. Provide a minimum clearance of 24" (610 mm) around the
perimeter of the bath.
IMPORTANT! To ensure a successful installation, it is critical that the bath be installed on a perfectly
level finished floor.
Apply the finished flooring material prior to installing the bath.
Confirm the finished floor is perfectly level before proceeding with the bath installation.
Kohler Co.
24" (610 mm) Max. Distance
Between Blower and Outlet
Air Intake
Install a GFCI-protected
120 V, 15 A grounded outlet.
5
1220597-2-A