Kohler K-11344 설치 및 관리 매뉴얼 - 페이지 6
{카테고리_이름} Kohler K-11344에 대한 설치 및 관리 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler K-11344 45 페이지. Freestanding bath
Kohler K-11344에 대해서도 마찬가지입니다: 설치 및 관리 매뉴얼 (28 페이지), 설치 매뉴얼 (25 페이지), 러프인 매뉴얼 (4 페이지)
2. Prepare the Faucet and Drain Site
CAUTION: Risk of product damage. Do not kink or cause damage to the cable on the bath drain during
installation.
IMPORTANT! The K-7219 bath drain is required for this installation.
Mark the drain location on the subfloor. Use the cut-out template provided with the bath to assist
you.
Assemble the drain. Refer to the "Assemble the Drain" section in the installation guide packed with
the drain.
Insert the drain into the P-trap through the cutout in the floor.
Install the finished floor material on the subfloor.
Verify the distance from the top of the drain flange to the top of the finished floor is 1-1/2" (38
mm). Adjust as needed to achieve this distance.
Ensure the drain is on center at the marked locations using a level. Adjust as needed.
1220597-2-A
Top of Flange
Finished Floor
6
1-1/2" (38 mm)
Kohler Co.