4. Connect the ATS or remote start/stop switch.
Route low-voltage communication leads through
separate conduit.
a. For a Model RRT transfer switch: Connect
the Model RRT transfer switch interface panel
to connections ATS1--ATS4. See Figure 1-21.
Note: To ensure that the controller recognizes the
Model RRT transfer switch, connect leads
ATS1 through ATS4 to the terminal block
before connecting the engine starting
battery.
Generator
Set
1. 14/20RES/RESL generator set field-connection terminal block
2. Controller interface module location on the ATS, typical
3. Interface module connector P14
4. ATS1 through ATS4 on generator set field-connection terminal block
Figure 1-21 Model RRT Transfer Switch Connection to Generator Set Terminal Block
24
Section 1 Installation
1
GM66565
4
b. For a remote start/stop switch or Model RDT
or RSB transfer switch: Connect the engine
start leads from the transfer switch or remote
start switch to terminals 3 and 4 on the terminal
block. Route the engine start leads through
separate conduit from the AC power and load
leads.
5. Connect utility power to the terminal block
connections labelled Utility. Connect to a circuit
that is supplied by the utility source and backed up
by the generator. The power source must be GFCI
protected. See Section 1.8.2 for more information
about the utility power requirement.
Customer
connections
12- -24 AWG
3
2
GM63552
TP-6733 8/11
ATS
ADV-7598