4. Preliminary checks
The preliminary checks must be carried out only by professionals and by paying maximum attention. The correct wiring of the motor and the limit
switches is very important for the correct functioning of the automation.
Unlock the motor and supply the system with power only
after controlling the wiring connections and checking the
1
absence of short circuits
Manually bring the gate to a total opening position and
2
check the status of led LS.OP.
Manually bring the gate to a total closing position and
3
check the status of led LS.OP.
Manually bring the gate to the middle of the run and then
lock the motor.
Enter the parameter Manual Movement of MENU B and
4
command the closure of the gate.
WARNING: pay attention with the moving gate!
Enter the parameter Manual Movement of MENU B and
5
command the opening of the gate.
WARNING: pay attention with the moving gate!
Once all above operations are successfully terminated, close
6
the automation and lock the motor.
5. Manual motion (Menu B - Manual movement)
This operation must be carried-out only by qualified personnel and by paying maximum attention.
The manual motion is an operation planned only for the phase of installation; it allows to move the gate at a limited speed in both directions.
WARNING: the photocells and the safety edge are not monitored during this phase!
Access to parameter Manual Mov. of MENU
B and confirm by pressing key P2
6. Learning
6.1 Learning the run of the gate (Menu B - Final position)
Learning the run allows to define the parameters of the run of the gate, such as the width of the run at normal speed and at slowed speed.
Check that the adjustment of the torque and the speed of the gate are set before carrying out the learning phase.
Check that the gate is closed before starting the learning phase.
Enter the parameter Final Position of MENU
B and confirm by pushing key P2
Exit the menu by scrolling the entries until you
find EXIT
6-1622595
rev.06
13/01/2017
Move the gate by using keys P1 and P3.
Press key P2 or wait 15 sec. in order to exit the menu
S tart moving the gate by pressing and releasing key P1 (START) or a Step-
by-Step key.
P ush key P1 (START) or a Step-by-Step key when the gate reaches the
point where you want to start the slowdown in the opening phase
T he gate continues its run at reduced speed as far as it hits the opening
limit.
O nce the opening limit has been reached, the gate starts to close.
P ush key P1 (START) or a Step-by-Step key when the gate reaches the
point where you want to start the slowdown in the closing phase
T he gate continues its run at reduced speed as far as it hits the closing limit.
T he programming is terminated once the closing limit is reached.
Note: in case no slowdown zones are set, then the control unit follows the
factory settings.
ITA
ENG
FRA
ESP
DEU
Check the status of the LEDs input by considering that all
normally closed (NC) inputs must have their corresponding
led alighted.
Led LS.OP is off. Correct functioning
Led LS.OP is on, but led LS.CL is off; check the
connection of the limit switches.
Led LS.CL is off. Correct functioning.
Led LS.CL is on, but led LS.OP is off; check the
connection of the limit switches
The motor starts to move. Watch its sense of rotation:
If the gate opens, then stop the manual motion,
disconnect the system from the power and reverse the
motor connections. Then try again.
If the gate closes, then stop the manual motion and go to
the following phase
The motor starts to move. Watch its sense of rotation:
If the gate closes, then stop the manual motion,
disconnect the system from the power and reverse the
motor connections. Then try again.
If the gate opens, then stop the manual motion and go to
the following phase
POR