Olympus BH2-CH Substage 어셈블리 - 페이지 23

{카테고리_이름} Olympus BH2-CH Substage에 대한 어셈블리을 온라인으로 검색하거나 PDF를 다운로드하세요. Olympus BH2-CH Substage 26 페이지.

Olympus BH2-CH Substage 어셈블리
Use a 1.5mm Allen wrench or driver to tighten the two
M3x4 set screws to secure the condenser-height knob
to the condenser-height shaft (see
Figure 94 – Tighten set screws to secure the height knob

Adjust the Tension of the Condenser-Height Shaft

Use a suitable slotted screwdriver to tighten the tension
screw until the condenser-height knob has the desired
feel, with no thrust play in the condenser-height shaft
(see
Figure
95).
Figure 95 – Adjust tension screw for no thrust play
Use a suitable tool (e.g., sharp needle-nose pliers) to
snug the lock nut for the tension screw, to lock the
tension screw in position (see
Figure 96 – Tighten lock nut to secure tension screw
Complete Teardown, Cleaning/Lubrication, and Reassembly of the Olympus BH2-CH Substage Assembly
Figure
94).
Figure
96).

Reinstall the Dovetail Blocks

Place the right-hand dovetail block into position on the
main housing (see
Figure
M2x8 alignment pins in the dovetail block seat into the
alignment holes in the main housing.
Figure 97 – Place right-hand dovetail block onto housing
Use a 2.5mm Allen wrench or driver to reinstall three
M3x6 hex socket-head cap screws to secure the right-
hand dovetail block onto the main housing (see
98).
Figure 98 – Reinstall screws to secure right dovetail block
Place the left-hand dovetail block into position on the
main housing (see
Figure
M2x8 alignment pins in the dovetail block seat into the
alignment holes in the main housing.
Figure 99 – Place left-hand dovetail block onto housing
97). Make sure that the two
Figure
99). Make sure that the two
Revision 1
Page 23 of 26