Axminster Engineer Series 원본 사용 설명서 - 페이지 8

{카테고리_이름} Axminster Engineer Series에 대한 원본 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Axminster Engineer Series 16 페이지. Pillar drill
Axminster Engineer Series에 대해서도 마찬가지입니다: 운영 매뉴얼 (20 페이지), 원본 사용 설명서 (16 페이지), 원본 사용 설명서 (19 페이지), 원본 사용 설명서 (18 페이지)

Axminster Engineer Series 원본 사용 설명서
ASSEMBLY
To assemble your CT-502H, follow the instructions given below:
The CT-502H comes with two swivel casters and two
lock swivel casters or portability. To install the casters:
1. Put a piece cardboard on the floor to prevent the dust
collector body from being scratched. Get the help of a
friend or assistant and position the dust collector on
the cardboard on its side.
2. Attach the swivel caster to the dust collector base by
aligning the four holes on the base with the four holes
on the swivel caster bracket and securing it using screws provided.
To install the inlet:
Align the holes on the inlet with the holes on the dust
collector and secure it using screws provided.
To install the Y-inlet:
Align the holes on the Y-inlet with the holes on the dust
collector and secure it using screws provided.