AlphaESS SMILE-G3-S5 하드웨어 커미셔닝 - 페이지 15
{카테고리_이름} AlphaESS SMILE-G3-S5에 대한 하드웨어 커미셔닝을 온라인으로 검색하거나 PDF를 다운로드하세요. AlphaESS SMILE-G3-S5 18 페이지.
Commissioning Procedures
1.5.2. Check the PV Generation and Discharging Function of the Product
Step1: Please switch off the PV switch on the energy storage inverter and the AC
breaker on the PV inverter if there is any. Switch on some larger loads to see the
battery discharging status.
Step 2: Please switch on the PV switch on the energy storage inverter and the AC
breaker on the PV inverter if there is any. Check the running status of the system.
1.5.3. Check the UPS State of the Product
Switch off the external AC breaker between the grid and the inverter. The inverter
will enter the UPS mode at once.
Switch on the external AC breaker between the inverter and the backup loads.
Please connect a low-power electrical appliance to the socket of backup load.
The relative value should be like this:
Load = GRID
+
Battery
The relative value should be like this:
Load = PV
±
GRID
±
Battery
±:
charging: - ; discharging:
PV arrow
should be as the picture shows.
±:
>>absorbing from grid: +;
<<
feed-in to grid:-
If not correct, please check the CT or meter installed
direction on PV side
15
+