AlphaESS SMILE-G3-S5 Uruchomienie sprzętu - Strona 15

Przeglądaj online lub pobierz pdf Uruchomienie sprzętu dla Przechowywanie AlphaESS SMILE-G3-S5. AlphaESS SMILE-G3-S5 18 stron.

Commissioning Procedures
1.5.2. Check the PV Generation and Discharging Function of the Product
Step1: Please switch off the PV switch on the energy storage inverter and the AC
breaker on the PV inverter if there is any. Switch on some larger loads to see the
battery discharging status.
Step 2: Please switch on the PV switch on the energy storage inverter and the AC
breaker on the PV inverter if there is any. Check the running status of the system.
1.5.3. Check the UPS State of the Product
 Switch off the external AC breaker between the grid and the inverter. The inverter
will enter the UPS mode at once.
 Switch on the external AC breaker between the inverter and the backup loads.
 Please connect a low-power electrical appliance to the socket of backup load.
The relative value should be like this:
Load = GRID
+
Battery
The relative value should be like this:
Load = PV
±
GRID
±
Battery
±:
charging: - ; discharging:
PV arrow
should be as the picture shows.
±:
>>absorbing from grid: +;
<<
feed-in to grid:-
If not correct, please check the CT or meter installed
direction on PV side
15
+