Cisco Catalyst 2960-S Series 시작 설명서 - 페이지 17

{카테고리_이름} Cisco Catalyst 2960-S Series에 대한 시작 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco Catalyst 2960-S Series 31 페이지. Switch getting
Cisco Catalyst 2960-S Series에 대해서도 마찬가지입니다: 데이터시트 (28 페이지), 설치 매뉴얼 (27 페이지)

Cisco Catalyst 2960-S Series 시작 설명서
Catalyst 2960-S Switch Getting Started Guide
Powering Guidelines
OL-19793-02
This is an example of a redundant stack cable connection using both the 0.5- and
3-meter FlexStack cables.
Consider these guidelines before you power the switches in a stack:
If you want a particular switch to become the stack master, power on that
switch first. This switch becomes the stack master and remains the stack
master until a master reelection is required. After 2 minutes, power on the
remaining switches in the stack.
Power off a switch before you add it to or remove it from an existing switch
stack.
For more information on stack master elections, see the "Managing Switch
Stacks" chapter in the switch software configuration guide on Cisco.com.
Catalyst 2960-S Switch Getting Started Guide
17