Cisco 1805 하드웨어 설치 매뉴얼 - 페이지 7
{카테고리_이름} Cisco 1805에 대한 하드웨어 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco 1805 12 페이지. Integrated services router
Cisco 1805에 대해서도 마찬가지입니다: 설치 및 교체 (4 페이지), 빠른 시작 매뉴얼 (4 페이지), 데이터시트 (10 페이지)
Chapter 8
Installing and Upgrading Internal Modules in Cisco 1805 Cable Routers
When you install an AIM, always wear an ESD-preventive wrist strap, and ensure that it makes good
Caution
contact with your skin. Connect the equipment end of the wrist strap to the metal part of the chassis.
Handle AIMs by the edges only. AIMs are ESD-sensitive components and can be damaged by
Caution
mishandling.
Accessory Kit to Use
Some AIMs are provided with multiple accessory kits that contain different configurations of mounting
hardware. Mounting hardware for the Cisco 1805 cable router consists of two machine thread metal
standoffs, two machine thread metal screws, and one plastic standoff.
To install an AIM module on the Cisco 1805 cable router, use the hardware in mounting kit 69-1316-01.
Installation Procedure
To install the AIM, perform the following steps. You need a number 2 Phillips screwdriver or flat-head
screwdriver to complete this procedure.
Find the metal standoff attachment locations on the system board near the AIM connector, indicated by
Step 1
a star pattern, as shown in
Figure 8-7
System board
Install the two metal standoffs from the accessory kit into the system board in the metal standoff
Step 2
attachment locations. Use a 1/4-inch nut driver to tighten the standoffs. Locations for AIM standoffs are
denoted by a star pattern around the standoff mounting holes.
Make sure that the standoffs are installed straight. Tighten them gently but firmly. The shoulder must be
Caution
seated tightly against the system board.
OL-14661-01
Figure
8-7.
Location of Metal Standoff Attachment Locations
Cisco 1805 DOCSIS Cable Router Hardware Installation Guide
Modules Internal to the Cisco 1805 Cable Router
AIM connector
8-7