Cisco Firepower 2130 설치 및 유지 관리 - 페이지 24
{카테고리_이름} Cisco Firepower 2130에 대한 설치 및 유지 관리을 온라인으로 검색하거나 PDF를 다운로드하세요. Cisco Firepower 2130 26 페이지. Rack-mount and ground the chassis
Cisco Firepower 2130에 대해서도 마찬가지입니다: 매뉴얼 (12 페이지), 배포 매뉴얼 (8 페이지), 시작하기 (42 페이지)
Install the FIPS Opacity Shield in a Four-Post Rack
When you toggle the power switch from ON to OFF, it takes several seconds for the system to power
Note
down. Do not remove the power cable until the power LED is off. After removing power from the chassis
either by moving the power switch to OFF or unplugging the power cord, wait at least 10 seconds before
turning power back ON.
Step 4
Route the cables through the openings in the cable management brackets (see figure below).
Step 5
Attach the FIPS opacity shield to the cable management brackets using the four 8-32 x 0.375 inch Phillips screws
provided in the FIPS kit.
Figure 13: Route the Cables and Attach the Screws
1
FIPS opacity shield
3
Cable management bracket
Step 6
Before you attach the TELs, clean the chassis of any grease, dirt, or oil with alcohol-based cleaning pads.
Step 7
Attach the seven TELs. See the figure below for the correct placement. Allow the TELs to cure for a minimum of 12
hours.
Caution
Any deviation in the placement of the TELs means the chassis is not in FIPS mode.
Installation, Maintenance, and Upgrade
24
Installation, Maintenance, and Upgrade
2
8-32 x 0.375 inch-Phillips screws (two per side)