Aeon Labs Nano Shutter 사용자 설명서 - 페이지 5
{카테고리_이름} Aeon Labs Nano Shutter에 대한 사용자 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. Aeon Labs Nano Shutter 10 페이지.
1. Mounting the gang box.
2. Position all wires to provide room for the device. Place the Nano Shutter inside the gang box towards the back of the
box.
3. Position the antenna towards the back of the box, away from all other wiring.
4. Reinstall the Nano Shutter to the gang box.
5. Reinstall the cover onto the gang box.
Note: 1. The gang box should be sized 3×2×2.75 inch / 75×50×70 mm or larger, minimum volume 14 in / 230cm .
2. Use flexible copper conductors only.
5. Restore Power.
Restore power at the circuit breaker or fuse.
Quick Start.
Adding your Nano Shutter to a Z-Wave network.