TEHI95094 – rev. 1
-
-
-
-
For special installation requirements or other operating conditions, please contact ABB.

6.3 Initial Setting or Previous Setting Modification Instructions

Remove the contact cap (Fig. 1 A) with a 34mm fork spanner holding the base (Fig. 1 B)
with the hand. Check condition of O-ring (Fig. 2 E), and replace if necessary, applying
grease on it.
Figure 1
With a small screwdriver, set the dip switches for calibrating current (Fig. 2 C, 4 switches)
and Counting Operations (Fig. 2 D, 2 switches), according to settings table 1.
Note: handle with care without forcing the switches. Settings must be made in a clean
and dry environment.
Figure 2
IEC 60694
IEC 61936: Electrical Installation
ANSI C37 63: Automatic Sectionalizer
All accident prevention regulations in force in relative countries