Zanussi ZHI 623 설치, 사용 및 유지보수 핸드북 - 페이지 9
{카테고리_이름} Zanussi ZHI 623에 대한 설치, 사용 및 유지보수 핸드북을 온라인으로 검색하거나 PDF를 다운로드하세요. Zanussi ZHI 623 15 페이지.
Zanussi ZHI 623에 대해서도 마찬가지입니다: 설치, 사용 및 유지보수 핸드북 (16 페이지)
EVACUATION BY RECYCLING
- Put the adjustment lever to the recycling position (down) and after installing the
active carbon filter (as described in the installation part of these instructions and in
accordance with the instructions attached to the recycling kit) the recycled air is
discharged through the louvers at the top of the hood facade.
- In this case the hood must be drawn fully down to completely free the facade louvers.
Replacement of the auvent (panel and facade assembled)
- Lift the auvent by its
lower part and
insert the two upper
guide-slides in their
r e s p e c t i v e
housings.
- Pivot the auvent
d o w n w a r d s
inserting the two
lower guide-slides
and tilt the auvent
until it closes.
- Reopen the auvent
to make sure that it
operates correctly
and to check the
presence of the stop at full opening.
- Depending on the weight of the facade, the friction resistance of the auvent may be
adjusted from the inside by means of screws located at the front corners of the
appliance (fig. 9).
- If necessary, make a final alignment with the adjacent furniture by adjusting the
auvent screws supporting the facade.
ELECTRICAL CONNECTION
- Connect the appliance cord to a 10/16 A standard grounded power outlet (2 pins +
earthing pin), preferably located above the hood.
- If the power outlet is not permanently accessible, a 3-pole switch will have to be
provided in the installation with a minimum contact opening of 3 mm.
- The installation shall comply with standard NF C 15.100.
106_10FA
9
9