Clarke CONTRACTOR DEVIL371PD 운영 및 유지 관리 지침 - 페이지 7

{카테고리_이름} Clarke CONTRACTOR DEVIL371PD에 대한 운영 및 유지 관리 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. Clarke CONTRACTOR DEVIL371PD 17 페이지. Devil quartz halogen heater

Clarke CONTRACTOR DEVIL371PD 운영 및 유지 관리 지침

UNPACKING AND ASSEMBLY

UNPACKING
Before assembling, please check contents against the following list and advise
your dealer immediately if any parts are missing.
1 x Heater
2 x Support Frames with castors (2 with brakes)
1 x Handle
1 x Fixings pack
1 X Remote control unit
ASSEMBLY
1. Attach the supporting frames to
the heater body using 14 mm
securing bolts supplied.
• The braked castors should be at
the rear of the heater
2. Attach the handle to each side of
the heater body using the 10 mm
bolts and plastic spacers.
• The handle should be facing
away from the rear of the
heater.
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
7