ABB REM 610 설치 매뉴얼 - 페이지 9

{카테고리_이름} ABB REM 610에 대한 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. ABB REM 610 20 페이지. Motor protection relay
ABB REM 610에 대해서도 마찬가지입니다: 제품 설명서 (16 페이지), 제품 설명서 (17 페이지)

ABB REM 610 설치 매뉴얼
1MRS 752265-MUM
0RWRU 3URWHFWLRQ 5HOD\
Installation Manual
)OXVK PRXQWLQJ
You will not need a separate mounting kit when flush mounting the case. All
mounting accessories are included in the case.
To flush mount the case to the cut-out in the panel, first loosen the 4 M5 fixing
screws approximately 7 turns. Mount the case to the mounting cut-out and tighten
the screws; see
Fig. 4.3.-1
torque is 0.7...1Nm.
The enclosure class of the flush-mounted device is IP 54 on the front side, while the
rear side fulfils the IP 20 requirements (top of the relay: IP 40).
Caution!
!
A device equipped with optic connections requires a minimum
depth of 180 mm.
Panel
)LJ )OXVK PRXQWLQJ RI D FDVH
. The allowed value range for the fixing screws' tightening
Case
Fixing screws
M5 T25 Torx head
5(0
9