ClearView PowerBoards PB-DG-001 설치 및 사용 설명서 - 페이지 3
{카테고리_이름} ClearView PowerBoards PB-DG-001에 대한 설치 및 사용 설명서을 온라인으로 검색하거나 PDF를 다운로드하세요. ClearView PowerBoards PB-DG-001 9 페이지. For ram 1500 pick-up truck 2015-2018
The following instruction is for installation of the right-hand side Power Board.
Follow same instruction for installation of left-hand side Power Board.
Installing mounting brackets to vehicle
1. Disassemble mounting bracket assembly by undoing M8 nuts. Avoid mix up of components. This will
separate the Top Mounting Bracket from the Swivel/Idler Brackets
1-RF
2. There are 3 sets of mounting holes in the Vehicle Sill Panel. 6 Holes in total. The front and rear sets
of holes are already fitted with Weld Nut as existing fixing points for the original fixed step. 2xWeld
Nuts in the front set of holes and 1xWeld Nut in the rear set of holes.
You must fit 3 new Nutserts into the holes without weld nuts, to provide 6 fixing points for the new
Power Board Mounting Brackets
Using the M10 Nutserts and Spacer tool provides, insert the Nutserts into the existing hopes and
with an M10 Bolt, tighten the Bolt until the Nutsert deforms and locks into the Sill Panel. Repeat for
3 Nutserts on both sides of the vehicle.
Page | 3
Due to Clearview Continuous Improvement Program, information may change without notice.
Clearview takes no responsibility for the result of incorrect use of these installation instructions.
1-RM
PB-TA-001
PB-DG-001
1-RR
April 2018