COMBA CriticalPoint BBU V2 Quick Installation Manual - Page 9

Browse online or download pdf Quick Installation Manual for Conference System COMBA CriticalPoint BBU V2. COMBA CriticalPoint BBU V2 10 pages. Annunciator panel
Also for COMBA CriticalPoint BBU V2: Quick Installation Manual (11 pages)

COMBA CriticalPoint BBU V2 Quick Installation Manual

Troubleshooting

If annunciator does not power on or does not appear in BBU GUI after wiring has been confirmed, use a multimeter to
check the following pins for resistance and voltage according to the below instructions.

BBU Measurements

1. Turn on the BBU.
2. Measure voltage from 1->3 and 2->3.
1 to 3
2 to 3
1. Turn off the BBU.
2.
Measure the resistance from 1->3, 2->3, and 1->2.
1 to 3
2 to 3
1 to 2

Annunciator Panel Measurements

1. Turn ON the annunciator panel.
2. Measure voltages across 1->3 and 2->3
Voltage should be around 1.65V +- 0.05V.
1 to 3
2 to 3
©2021 Comba Telecom. All Rights Reserved.
568 Gibraltar Drive, Milpitas, CA 95035 | +1 866 802 7961 |
BBU V1
www.combausa.com
~ 1.65 VDC
~ 1.65 VDC
~ 450 Ohms
~ 450 Ohms
~ 50 Ohms
~ 1.65 VDC
~ 1.65 VDC
BBU V2
Version 1.0.0
9
1.18.21