COMBA CriticalPoint BBU V2 Руководство по быстрой установке - Страница 9

Просмотреть онлайн или скачать pdf Руководство по быстрой установке для Конференц-система COMBA CriticalPoint BBU V2. COMBA CriticalPoint BBU V2 10 страниц. Annunciator panel
Также для COMBA CriticalPoint BBU V2: Руководство по быстрой установке (11 страниц)

COMBA CriticalPoint BBU V2 Руководство по быстрой установке

Troubleshooting

If annunciator does not power on or does not appear in BBU GUI after wiring has been confirmed, use a multimeter to
check the following pins for resistance and voltage according to the below instructions.

BBU Measurements

1. Turn on the BBU.
2. Measure voltage from 1->3 and 2->3.
1 to 3
2 to 3
1. Turn off the BBU.
2.
Measure the resistance from 1->3, 2->3, and 1->2.
1 to 3
2 to 3
1 to 2

Annunciator Panel Measurements

1. Turn ON the annunciator panel.
2. Measure voltages across 1->3 and 2->3
Voltage should be around 1.65V +- 0.05V.
1 to 3
2 to 3
©2021 Comba Telecom. All Rights Reserved.
568 Gibraltar Drive, Milpitas, CA 95035 | +1 866 802 7961 |
BBU V1
www.combausa.com
~ 1.65 VDC
~ 1.65 VDC
~ 450 Ohms
~ 450 Ohms
~ 50 Ohms
~ 1.65 VDC
~ 1.65 VDC
BBU V2
Version 1.0.0
9
1.18.21