Anzzi SB-AZ013WL Install & Operation Manual - Page 10

Browse online or download pdf Install & Operation Manual for Plumbing Product Anzzi SB-AZ013WL. Anzzi SB-AZ013WL 14 pages. Shower base
Also for Anzzi SB-AZ013WL: Installation & Care Manual (8 pages)

Anzzi SB-AZ013WL Install & Operation Manual
STEP 2
Place the tray into the designated position
so that the Drain Body drops around the
Drain Pipe and put the Shower Base up
against the studs.
Level the tray and place marks on the studs
above the upper edge of the tile flange.
If the subfloor is not flat and level, use
leveling compound or mortar bed to
ensure that the base is level (shown in Step 5).
(Fig 2)
STEP 3
Drill 3/16" holes at all stud locations on top
flanges.(Fig 3)
IMPORTANT: Drill 3/16" clearance holes
into flanges only. Do not drill 3/16" holes
directly into studs. Drill chuck can damage
base. Use an extended bit holder to reduce
risk of drill chuck hitting base.
Fig. 2
Fig. 3
8