Anzzi SB-AZ013WL Install & Operation Manual - Page 10
Browse online or download pdf Install & Operation Manual for Plumbing Product Anzzi SB-AZ013WL. Anzzi SB-AZ013WL 14 pages. Shower base
Also for Anzzi SB-AZ013WL: Installation & Care Manual (8 pages)
STEP 2
Place the tray into the designated position
●
so that the Drain Body drops around the
Drain Pipe and put the Shower Base up
against the studs.
Level the tray and place marks on the studs
●
above the upper edge of the tile flange.
If the subfloor is not flat and level, use
●
leveling compound or mortar bed to
ensure that the base is level (shown in Step 5).
(Fig 2)
STEP 3
Drill 3/16" holes at all stud locations on top
●
flanges.(Fig 3)
IMPORTANT: Drill 3/16" clearance holes
into flanges only. Do not drill 3/16" holes
directly into studs. Drill chuck can damage
base. Use an extended bit holder to reduce
risk of drill chuck hitting base.
Fig. 2
Fig. 3
8