Anzzi SB-AZ013WL Kurulum ve Kullanım Kılavuzu - Sayfa 10

Sıhhi Tesisat Ürünleri Anzzi SB-AZ013WL için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Kılavuzu indirin. Anzzi SB-AZ013WL 14 sayfaları. Shower base
Ayrıca Anzzi SB-AZ013WL için: Kurulum ve Bakım Kılavuzu (8 sayfalar)

Anzzi SB-AZ013WL Kurulum ve Kullanım Kılavuzu
STEP 2
Place the tray into the designated position
so that the Drain Body drops around the
Drain Pipe and put the Shower Base up
against the studs.
Level the tray and place marks on the studs
above the upper edge of the tile flange.
If the subfloor is not flat and level, use
leveling compound or mortar bed to
ensure that the base is level (shown in Step 5).
(Fig 2)
STEP 3
Drill 3/16" holes at all stud locations on top
flanges.(Fig 3)
IMPORTANT: Drill 3/16" clearance holes
into flanges only. Do not drill 3/16" holes
directly into studs. Drill chuck can damage
base. Use an extended bit holder to reduce
risk of drill chuck hitting base.
Fig. 2
Fig. 3
8