agui OKATT DNP16-01 Manual For Installation And Use - Page 7
Browse online or download pdf Manual For Installation And Use for Lifting Systems agui OKATT DNP16-01. agui OKATT DNP16-01 9 pages. Pivoting buffer support
DNP16-01
By: E. Irazu.
Reviewed by: J. Fernández
PULLEY
PULLEY
1
2
The length of the cables is:
-
Activation cable: 5 metres.
-
Deactivation Cable: 7 metres.
Once the pulleys have been correctly fitted and checked, it is advisable to shorten the cables, leaving them at
the exact length required to prevent any excess loose cables inside the pit.
The green cable can be shortened from the handle, but loosening the set screw and sliding it until the cable is
at the ideal length to prevent any excess cable from remaining in the pit.
The red cable can be shortened from the opposite end, loosening the M8 DIN 985 bolt and pulling the cable
until it is long enough to cross the pit.
MANUAL FOR INSTALLATION AND USE
DNP16-01. PIVOTING BUFFER SUPPORT
BRAND PRODUCT
DEPARTMENT
Cable aligned with the
opening system pulley
Cable aligned with the
opening system pulley
Rev:2
7