Fujitsu ETERNUS AF250 Setup Manual - Page 2
Browse online or download pdf Setup Manual for Storage Fujitsu ETERNUS AF250. Fujitsu ETERNUS AF250 12 pages. Hybrid storage systems, all-flash arrays, power synchronized unit
Also for Fujitsu ETERNUS AF250: Configuration Manual (18 pages), Safety Precautions (12 pages), Site Planning Manual (38 pages)
Installation in a Rack
STEP
The rack rail needs to be attached to the rack and the controller enclosure or the drive enclosure needs to be
installed.
Configuration Guide (Basic)
The center of gravity must be taken into consideration to prevent a rack from toppling over. The controller
IMPORTANT
enclosure and drive enclosures should generally be installed from bottom to top to lower the center of gravity
and to ensure the safe use of racks.
1.
Attach the rack rails to the rack.
The size of the controller enclosure and each drive enclosure is 2U.
Plate
M5 screws
(Front rack pillars)
2.
Install and fasten the controller enclosure or the drive enclosure in the rack.
●
To fasten the controller enclosure
Use three M5 screws to fasten the controller enclosure to the rack pillars and attach the flange cover.
M5 screws
Flange cover
Rack rail (for left side)
Washers
Plate
M5 screws
Rack rail (for right side)
M5 screws
Flange cover
FUJITSU Storage ETERNUS AF250 All-Flash Arrays Setup Guide
Copyright 2017 FUJITSU LIMITED
(Rear rack pillars)
M5 screws
M5 screws
Washers
2
P3AG-1862-02ENZ0