ABB CPS6000 Quick Start Manual - Page 2
Browse online or download pdf Quick Start Manual for Industrial Equipment ABB CPS6000. ABB CPS6000 6 pages.
Also for ABB CPS6000: Quick Start Manual (8 pages)
QUICK START GUIDE
Step 2 - Connect AC Inputs
Step 3 - Connect Chassis and DC Reference (CO) Grounds
Connections are on the rear.
•
Lug Landing: #10 on 5/8-inch center (lugs not provided)
•
10 AWG recommended
1.
Connect Chassis Ground - Torque to 30 in-lb (4 Nm)
2.
Connect DC Reference Ground - Torque to 30 in-lb (4 Nm)
- Bulk load output
(unprotected)
Chassis Ground.
Step 4 - Connect DC Output
Connections are on the rear. The shelf provides unprotected bulk output to an external distribution panel.
1.
Lug Landing: #10 on 5/8-inch center (lugs not provided)
2.
Connect +Bulk and -Bulk cables - Torque to 30 in-lb (4 Nm)
Step 5 - Set Jumpers - LAN Port and Relay per Galaxy Pulsar Edge Controller Quick
Start Guide
1.
Set Jumpers - LAN Port and Relay
Step 6 - Install Controller per Galaxy Pulsar Edge Controller Quick Start Guide
Step 7 - Install Signal and Communications Cables
Connectors are on front
See Information: Alarm Connections ... for Details
1.
J1 Alarms and Inputs - Connect to office alarms and signals.
2.
J5 LAN - Connect to Ethernet network.
Step 8 - Install 1-Wire Battery Temp and Voltage Monitor per Galaxy Pulsar Edge
Controller Quick Start Guide -
1.
Connect 1– Wire Battery Temp and Voltage Monitor to J2
Page 2
© 2021 ABB. All rights reserved.
(Continued)
Note: Some applications may rely on frame
mounting screws for chassis ground omitting the
shelf ground cable
Relay Jumpers
Optional
+ Bulk load output
(unprotected)
DC Reference
ground. If required.