Siemens SINAMICS G120 Getting Started - Page 23

Browse online or download pdf Getting Started for Industrial Equipment Siemens SINAMICS G120. Siemens SINAMICS G120 30 pages. Using blocksize converters in marine applications
Also for Siemens SINAMICS G120: Getting Started (46 pages), Operating Instructions Manual (32 pages), Hardware Installation Instructions (2 pages), Installation Instructions And Owner's Manual (2 pages), Installation Instructions (2 pages), Installation Instructions (2 pages), Compact Operating Instructions (32 pages), Manual (42 pages), Getting Started (50 pages), Device Manual (34 pages), Quick Install Manual (2 pages), Application Description (50 pages), Compact Operating Instructions (2 pages), Manual (31 pages), Applications Manual (34 pages), Compact Operating Instructions (2 pages), Compact Operating Instructions (2 pages)

Siemens SINAMICS G120 Getting Started
The basic commissioning wizard ends with the following dialog:
To complete basic commissioning, the motor data identification, selected during basic
commissioning must be performed via switching on the inverter. This can be done via
the chosen command source (e.g. terminals, BOP or communication) or via STARTER
as shown in the dialog box below.
Motor Data identification via STARTER
First click "Control panel" to open the dialog, then press "Assume control priority"
(when connected via PC connection Kit, select BOP link (RS232) (the "assume-button"
changes to "Return") and select "Enables". Now the ON and OFF buttons get active.
Press the ON button start the Motor data identification. While Motor data identification
is active, the
CU240E
Getting Started, 10/2007, A5E01301680B AA
-button is disabled and in the alarm 541 "Motor Identification active"
Commissioning
23