Siemens SINAMICS G120 Compact Operating Instructions - Page 26

Browse online or download pdf Compact Operating Instructions for Industrial Equipment Siemens SINAMICS G120. Siemens SINAMICS G120 32 pages. Using blocksize converters in marine applications
Also for Siemens SINAMICS G120: Getting Started (46 pages), Operating Instructions Manual (32 pages), Getting Started (30 pages), Hardware Installation Instructions (2 pages), Installation Instructions And Owner's Manual (2 pages), Installation Instructions (2 pages), Installation Instructions (2 pages), Manual (42 pages), Getting Started (50 pages), Device Manual (34 pages), Quick Install Manual (2 pages), Application Description (50 pages), Compact Operating Instructions (2 pages), Manual (31 pages), Applications Manual (34 pages), Compact Operating Instructions (2 pages), Compact Operating Instructions (2 pages)

Siemens SINAMICS G120 Compact Operating Instructions
Commissioning

4.3 Connecting the inverter to the fieldbus

4.
5.
6.
You have now completed motor data identification.
4.3
Connecting the inverter to the fieldbus
Where can I find instructions for the fieldbus connection of the inverter?
You can find instructions for the fieldbus connection on the Internet:
● Application examples (http://support.automation.siemens.com/WW/view/en/60733299)
● Operating instructions - inverter with Control Units CU2...: Manuals for the Control Unit
(http://support.automation.siemens.com/WW/view/en/30563628/133300)
● Function Manual, Fieldbus Systems: Manuals for the Control Unit
(http://support.automation.siemens.com/WW/view/en/30563628/133300)
Description files for fieldbuses
The description files are electronic device data sheets which contain all the required
information of a higher-level controller. You can configure and operate the inverter on a
fieldbus with the appropriate description file.
Description file
Generic Station Description
(GSD) for PROFIBUS
GSD Markup Language
(GSDML) for PROFINET
Electronic Data Sheet
(EDS) for CANopen
EDS for Ethernet/IP
26
Switch the motor on again in order to optimize the rotating measure-
ment.
Wait until the inverter switches off the motor after completion of the
optimization. The optimization time depends on the rated motor pow-
er: 20 s ... 2 min.
Switch the inverter control from HAND to AUTO.
Download
Internet:
(http://support.automation.siemen
s.com/WW/view/en/23450835)
Internet:
(http://support.automation.siemen
s.com/WW/view/en/26641490)
Internet:
(http://support.automation.siemen
s.com/WW/view/en/48351511)
Internet:
(http://support.automation.siemen
s.com/WW/view/en/78026217)
Compact Operating Instructions, 04/2015, A5E35792002B AA
Alternative to download
GSD and GSDML are saved in the
inverter. The inverter writes its
GSD or GSDML to the memory
card once you insert this card in
the inverter and set p0804 = 12.
You can then transfer the file to
your programming device or PC
using the memory card.
---
---
CU240B-2 and CU240E-2 Control Units