Cisco MX200 G2 Installation Manual - Page 5
Browse online or download pdf Installation Manual for Conference System Cisco MX200 G2. Cisco MX200 G2 6 pages. Wall mount
Also for Cisco MX200 G2: Installation Manual (7 pages), Installation Manual (8 pages), Quick Reference Manual (2 pages), Quick Reference Manual (2 pages), Quick Reference Manual (2 pages), Getting Started Manual (46 pages)
Installing Cisco TelePresence MX200 G2 - Table Stand
3
Lead out the cables
Lead the cables downward and out at the back.
78-100247-02A0 | JUNE 2016 | © 2016 Cisco Systems, Inc. All rights reserved.
Snap on the cable
channel lid for strain relief.
4
Start up the system
•
Connect to power and LAN/Ethernet.
•
Switch on the system. The power switch is next
to the power connector at the rear side of the
system.
Wait while the unit starts up. Normally this takes a few minutes.
It may include automatic software upgrade and restart of the
Touch controller.
•
Follow the instructions on the Touch controller.
Cisco Spark: To find more information on how to get started
with Spark registered systems, visit
and look for Getting Started articles for room systems.
Other services: For further information on set-up and
configuration, download the Getting Started Guide from the
Cisco web site,
http://www.cisco.com/go/mx-docs
Never move the camera manually when power is switched on;
always use the camera control function on the Touch controller
to change the camera position.
http://help.ciscospark.com
5