Blackberry Radar H2 Installation Manual - Page 28

Browse online or download pdf Installation Manual for Radar Blackberry Radar H2. Blackberry Radar H2 30 pages. Dry van, insulated trailers roll-up doors
Also for Blackberry Radar H2: Installation Manual (33 pages), Installation Manual (26 pages), Installation Manual (25 pages), Installation Manual (32 pages), Installation Manual (33 pages), Installation Manual (34 pages), Installation Manual (35 pages), Instruction Manual (33 pages), Installation Manual (32 pages), Installation Manual (26 pages), Installation Manual (25 pages), Installation Manual (28 pages)

Blackberry Radar H2 Installation Manual
28
BLACKBERRY RADAR H2 ITC100-1 INSTALLATION GUIDE
4. Place the module on the door, aligning the holes on the module with the holes in the
well nut. Insert your fastener of choice into the holes on the module and well nuts.
Use the appropriate tools to secure the module to the asset.
Tips for well nut installation
Tip 1: For fastest installation, we recommend using a drill and nut driver to
install the bolt into the well nut. To avoid over tightening, use the lowest
speed to install the bolt.
Tip 2: To avoid spinning the well nut during the install, we recommend
pressing the module against the door while installing each fastener.
5. Close both doors. Installation is complete.