Blackberry Radar H2 Installation Manual - Page 30

Browse online or download pdf Installation Manual for Radar Blackberry Radar H2. Blackberry Radar H2 30 pages. Dry van, insulated trailers roll-up doors
Also for Blackberry Radar H2: Installation Manual (33 pages), Installation Manual (26 pages), Installation Manual (25 pages), Installation Manual (32 pages), Installation Manual (33 pages), Installation Manual (34 pages), Installation Manual (35 pages), Instruction Manual (33 pages), Installation Manual (32 pages), Installation Manual (26 pages), Installation Manual (25 pages), Installation Manual (28 pages)

Blackberry Radar H2 Installation Manual
30
BLACKBERRY RADAR H2 ITC100-1 INSTALLATION GUIDE
2. Mark the height where the device will be installed on the door of the trailer/container.
The bottom of the device should be over 80" (203cm)* above the interior floor.
The unit should be level.
The unit should be installed as close to the center of the trailer/container as
possible. When installing on trailers or containers with door bars, ensure there is
approximately 1-2" (2.5-5cm) of clearance space between the left side of the unit
and the edge of the door bar.
3. Remove the adhesive from the rear of the template and place the template in the
desired installation location. The adhesive at the back of the template ensures that it
stays on the door surface for accurate drilling of your holes.