ABSCO SHEDS ADGAZEBO63 Handmatig - Pagina 12

Blader online of download pdf Handmatig voor {categorie_naam} ABSCO SHEDS ADGAZEBO63. ABSCO SHEDS ADGAZEBO63 14 pagina's. Signature gazebo

GUTTERING
FRONT VIEW - NOTE: Gutter falls to left for illustrative purposes only.
8
12
13
14
Absco Industries
Assembly Instruction Manual
ABSCO SIGNATURE GAZEBO
MODEL: ADGAZEBO63
6.12m W x 3.11m D x 2.60m H
8. The gutter needs fall to drive water to a specific
end. At the end you'd like the downpipe, mark
the underside of the gutter onto the beam.
This will be used as a reference when mounting
the gutter brackets RWG24.
Take the gutter down for now.
9. At the other end measure up another 10mm
from this reference line and make another mark
onto the beam at the point shown.
10. Take a string line and make a line from the
high to low point.
11. Align the bottom of the gutter bracket with
the marks and fasten to rear beam using rivets
FAST102.
• Place middle bracket at centre panel join.
• From there align with every 4th pan as shown.
12. Lift the gutter assembly and placed the rolled
top edge over the gutter bracket in the orientation
shown.
Roll the gutter around, make sure the front and
rear flashings go inside.
13. Lift so the bottom sits on the lower part of the
bracket.
Fold the tabs down by hand then rivet from below
as shown.
14. Rivet the gutter end stop to the front and rear
flashing.
Model: ADGAZEBO63
10
4/12/23
9
1.00
12