activTek INDUCT 10000 Handmatig - Pagina 13
Blader online of download pdf Handmatig voor {categorie_naam} activTek INDUCT 10000. activTek INDUCT 10000 16 pagina's. Electronic air purification system
Ook voor activTek INDUCT 10000: Handmatig (16 pagina's)
CHANGING THE BALLAST
6. Place new ballast into original
location and secure using the
two (2) nuts removed in step 4.
8. Re-install unit if removed from duct.
Reconnect power and check for
proper operation (Lamp indicator
should be lit when in operation).
(continued)
LAMP INDICATOR
7. Replace cover and secure with
the original four (4) screws.
13