Galvin Specialised Ezy-Drink CP-BS TD15EB Product Installatie Manuallijn - Pagina 3
Blader online of download pdf Product Installatie Manuallijn voor {categorie_naam} Galvin Specialised Ezy-Drink CP-BS TD15EB. Galvin Specialised Ezy-Drink CP-BS TD15EB 4 pagina's. Remote electronic drinking bubbler tap - battery
3. Fit Piezo Button
−
Install piezo button as shown.
−
Ensure the correct coloured washer is fitted
underneath the button.
5. Fit Solenoid and Outlet
−
Fit flexi-hose to solenoid outlet and
bubbler.
−
Connect water supply to solenoid inlet.
4. Connect Piezo Button, Solenoid and Battery
−
Connect Piezo button, the solenoid & the battery to the
eletronic control unit.
−
The unit is supplied with 2 x 3.2metre extension leads
for connecting to battery and solenoid.
6. Testing
−
Once the drinking tap has been installed and tested
for leaks, the water height may be adjusted to suit the
available pressure as shown above.
−
To adjust water flow
1. Remove the blanking screw.
2. Adjust the water height by turning the regulator
screw.
3. Once desired height has been achieved, replace
blanking screw.
Note: The full range from minimum flow to maximum flow is
only ¼ turn.
th
Version 1, 16
June, Page 3 of 4
Blanking Screw
Regulator Screw