Galvin Specialised Ezy-Drink CP-BS TD15EB Instrukcja instalacji produktu - Strona 3

Przeglądaj online lub pobierz pdf Instrukcja instalacji produktu dla Produkt hydrauliczny Galvin Specialised Ezy-Drink CP-BS TD15EB. Galvin Specialised Ezy-Drink CP-BS TD15EB 4 stron. Remote electronic drinking bubbler tap - battery

3. Fit Piezo Button
Install piezo button as shown.
Ensure the correct coloured washer is fitted
underneath the button.
5. Fit Solenoid and Outlet
Fit flexi-hose to solenoid outlet and
bubbler.
Connect water supply to solenoid inlet.
4. Connect Piezo Button, Solenoid and Battery
Connect Piezo button, the solenoid & the battery to the
eletronic control unit.
The unit is supplied with 2 x 3.2metre extension leads
for connecting to battery and solenoid.
6. Testing
Once the drinking tap has been installed and tested
for leaks, the water height may be adjusted to suit the
available pressure as shown above.
To adjust water flow
1. Remove the blanking screw.
2. Adjust the water height by turning the regulator
screw.
3. Once desired height has been achieved, replace
blanking screw.
Note: The full range from minimum flow to maximum flow is
only ¼ turn.
th
Version 1, 16
June, Page 3 of 4
Blanking Screw
Regulator Screw