DURKOPP ADLER 8967 Instrukcja instalacji - Strona 10

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Maszyna do szycia DURKOPP ADLER 8967. DURKOPP ADLER 8967 14 stron. Preface and general safety information
Również dla DURKOPP ADLER 8967: Instrukcja obsługi (15 strony)

DURKOPP ADLER 8967 Instrukcja instalacji

5. Attaching the Machine Head

5.1 Mounting the Sewing Head, Establishing the Voltage
Compensation, Positioning the V-belt
10
Mount the sewing head and fasten with three M8 x
95 Allan screws with washers and nuts.
Establish the voltage compensation.
Screw the enclosed single-wire cable 1 to the sewing
head.
Positioning the V-belt.
Set the V-belt tension.
By swinging the motor, tension the V-belt so that it
can be pressed in at its center by about 10 mm
without great effort.
Screw on the motor belt guard.
Set the cams so that the belt cannot slide out of the
V-belt pulley when the sewing machine is swung to
the back.
1