Gamma Progression ES II+ Instrukcja obsługi - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Maszyny naciągowe Gamma Progression ES II+. Gamma Progression ES II+ 17 stron.

Gamma Progression ES II+ Instrukcja obsługi

ASSEMBLY INSTRUCTIONS

provided with the machine in the event the lever lock bolts become inconvenient. Simply install
the M10 screws in place of the lever lock bolts and tighten with the wrench provided.
Turntable Installation
Insert the turntable center post into the
bushing of the stringing machine base.
Frame Support Post Installation
The ESII+ support post assemblies are pre-
cision aligned at the factory and are marked
for proper installation on the turntable.
Install the support post with the dot on its
base to an identical dot on the turntable.
Align the threaded hole in the bottom of the
frame support post with the slot in the turn-
table. Screw the lever lock bolt with washer
into the bottom of the support post and
tighten gently.Position the washer the
rounded edge toward the turntable. Repeat
procedure on the opposite side of the turn-
table.
NOTE: 2 pcs. of M10 cap screws (#170) are
Clamp Head Installation
The post of the string clamp head and tube
of the string clamp base are treated with
grease to provide protection against corro-
sion during shipping. Remove any exces-
sive grease with a clean cloth prior to use.
The post and tube may also be cleaned with
isopropyl alcohol. After this type of thorough
cleaning, the post and tube should be treated
with a light coating of machine oil to protect
the surfaces against corrosion and to en-
sure smooth operation.
3