Empire VFP36PB2EF-3 Instrukcje instalacji i instrukcja obsługi - Strona 12

Przeglądaj online lub pobierz pdf Instrukcje instalacji i instrukcja obsługi dla Kominek wewnętrzny Empire VFP36PB2EF-3. Empire VFP36PB2EF-3 20 stron. Premium universal firebox for all vent-free log sets see-through firebox models peninsula firebox models

Empire VFP36PB2EF-3 Instrukcje instalacji i instrukcja obsługi
4. Insert blower assembly into interior, bottom of firebox. Posi-
tion blower assembly so that you align the notch on back of
blower assembly with the center screw on side/end panel,
then push the blower assembly against firebox outer panel.
The blower wheel must be centered with the side/end wall of
the firebox. The magnets on the back and bottom of blower
assembly will sufficiently hold blower assembly in place. See
Figure 16.
5.
Once the blower assembly is in position, locate the plug but-
ton in the top corner of the firebox. Remove the plug with a
standard screwdriver and discard plug.
6. Next, find the fan control switch and wire assembly. Feed
the wires through the hole at the top of the firebox. Feed the
wires over the firebox top and down between the firebox side
and outer wrap then, secure the fan control switch with (2) #6
screws provided. See Figure 15.
7. The fan control wires will slide down between the firebox and
outer wrap near the blower assembly. See Figure 16.
8.
One fan control wire will have a 1/4" female terminal that must
be attached to the open terminal on the blower motor. See
Figure 19, Connection A.
9.
The other fan control wire has a 1/4" male terminal. Attach this
terminal to the open terminal on the blower power cord. See
Figure 19, Connection B
10. Route the wires away from moving parts of the blower assem-
bly and retain wires together near the blower motor using the
plastic purse clip provided.
11. To complete the installation, plug the power cord into the junc-
tion box receptacle previously installed in the bottom of the
firebox. See Figures 16 and 18.
12. Once all connections are made electrically, it is recommended
that you test the blower fan control operation by turning on
power to the blower (Caution: 110 Volt). Then apply heat to
the fan control switch inside the firebox with a lighter or match
until blower is activated. Once blower is activated, check for
proper operation. Do not place hands near blower assembly
or other wiring while power is on.
13. Replace blower access plate and louvers or flush panels. See
Figures 13 and 14.
14. This completes the installation of the optional FBB5 Blower kit
accessory.
Note: This blower is equipped with a heat activated fan control
switch. Blower will operate when the firebox warms up, and
will turn off automatically when the firebox cools down. The
time will vary for the activation of the fan control switch de-
pending on several factors including firebox/log set sizing,
BTU input variables, and log set positioning. Generally, it
may take from 5 to 20 minutes to activate blower/fan control
from a cold start.
FAN CONTROL
SWITCH LOCATION
Page 12
Figure 15
WIRES
FROM FAN
CONTROL
SWITCH
HEARTH
JUNCTION
BOX
POWER CORD
Figure 16
Figure 17
OUTER
WRAP
BLOWER ASSEMBLY
(CENTER AND INSTALL
AGAINST OUTER WRAP
AS SHOWN)
USE SCVI VARIABLE SPEED
CONTROL OPTION, OR STANDARD
ON/OFF WALL SWITCH TO
OPERATE OPTIONAL BLOWER
27451-6-0614