Direct Supply ATLAS Instrukcja obsługi - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Sprzęt medyczny Direct Supply ATLAS. Direct Supply ATLAS 17 stron. Sit-to-stand lift
Assembly
i) Install the base width adjusting handle.
WARNING: Ensure the mast is fully locked into position.
CAUTION: DO NOT overtighten mounting hardware. This will damage the mounting bracket.
CAUTION: Be sure the bolt is completely through boom assembly mounting bracket and actuator
assembly holes. If the mounting hardware is properly aligned when the boom assembly is secured to
the mast, the boom assembly will pivot easily.
12
(cont.)
Mounting the Battery Charger
CAUTION: Refer to your local regulations concerning proper mounting procedures.
a) Place the battery charger with mounting bracket on the wall at the desired position.
b) Mark the middle hole position with a pencil.
c) Measure down 6½ inches from the pencil mark, and drill one mounting hole.
d) Install the bottom mounting screw until there is an approximate
head and the wall.
e) Install the battery charger with mounting bracket onto the bottom mounting screw.
f) Drill the remaining two mounting holes.
g) Install the two remaining mounting screws through the mounting bracket and into the wall.
Tighten securely.
h) Plug the battery charger into the wall electrical outlet.
i)
Verify ON is illuminated.
Mounting Bracket
Mounting Screws
Bottom Mounting Screw
⁄
-inch gap between the screw
1
8
Battery Charger with
Mounting Bracket
13
1-800-634-7328
DirectSupply.com