ClipperCreek CS EVSE Pedestal Instrukcja instalacji - Strona 12
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Stojaki i stojaki ClipperCreek CS EVSE Pedestal. ClipperCreek CS EVSE Pedestal 20 stron. Electric vehicle supply equipment
CS EVSE PEDESTAL INSTALLATION GUIDE
INITIAL PEDESTAL INSTALLATION (continued)
ClipperCreek
, Inc.
For.the.Optional.1".Conduit.Assembly:
Some installations may require a conduit larger
than the standard ¾" assembly. For this purpose,
an optional 1" conduit assembly may be requested.
Follow these instructions and refer to Figure.10.to
install the optional 1" conduit.
•
It is highly recommended that connection
to the Ground Lugs inside the Pedestal Post be
completed at this time. Access will be limited
.
.
after.this.step.
•
Remove the 1" plastic plug located 3" down
from the top of the pedestal on the left side.
•
Unscrew the locknuts on either end of the
conduit.
•
Route the three conductors through the
following:
a) The inner locknut (inside of the pedestal)
b) The open pedestal hole
c) The first plastic washer (make sure the
washer is on the outside of the pedestal)
d) The conduit assembly
e) The second plastic washer (make sure
the washer is on the outside of the EVSE)
f) The outer locknut
•
The 1" conduit assembly may be disassembled
to make it easier to pull the conduit through
each fitting. Ensure the conduit is fully
reassembled before proceeding.
•
IMPORTANT: Remove the locknut (f) at
the end of the conduit assembly; this will
.
.
be.needed.in.a.later.step..See.locknut.(f).in..
.
.
Figure.10..Face the open end of the 90 degree
conduit fitting forward for later insertion into
the back of the EVSE.
Figure.10:.Optional.1".Conduit.Assembly
c.
d.
Page 12
a.
b.
e.
f.