Electrolux EFA90245X Manual do utilizador - Página 13

Procurar online ou descarregar pdf Manual do utilizador para Campânula de ventilação Electrolux EFA90245X. Electrolux EFA90245X 21 páginas. Electrolux cooker hood
Também para Electrolux EFA90245X: Manual de instalação (16 páginas), Manual de instalação (16 páginas)

Electrolux EFA90245X Manual do utilizador
The clereance height between the inferior part of
the cooker hood and the hob must be 650 mm (
some models can be fitted at a lower height from
the hob, please refer to the installation paragraph).
Drilling the Ceiling/Support Shelf
• Use a plumb line to mark the centre of the hob on the
ceiling/support shelf.
• Place the drilling template 21 provided on the ceiling/
support shelf, making sure that the template is in the
correct position by lining up the axes of the template
with those of the hob.
• Mark the centres of the holes in the template.
• Drill the holes at the points marked:
• For concrete ceilings, drill for plugs appropriate to
the screw size.
• For hollow brick ceilings with wall thickness of 20
mm: drill ø 10 mm (immediately insert the Dowels
not provided).
• For wooden beam ceilings, drill according to the
wood screws used.
• For wooden shelf, drill ø 7 mm.
• For the power supply cable feed, drill ø 10 mm.
• For the air outlet (Ducted Version), drill according
to the diameter of the external air exhaust duct
connection.
• Insert two screws of the following type, crossing them
and leaving 4-5 mm from the ceiling:
• For concrete ceilings, use the appropriate plugs for
the screw size (not provided).
• For Cavity ceiling with inner space, with wall thickness
of approx. 20 mm, Screws not provided.
• For wooden beam ceilings, use 4 wood screws (not
provided).
• For wooden shelf, use 4 screws with washers and
nuts (not provided)

Fixing the Frame

• Loosen the two screws fastening the lower chimney
and remove this from the lower frame.
• Loosen the two screws fastening the upper chimney
and remove this from the upper frame.
If you wish to adjust the height of the frame, proceed
as follows:
• Unfasten the eight metric screws joining the two
columns, located at the sides of the frame.
• Adjust the frame to the height required, then replace
all the screws removed as above.
• Insert the upper chimney stack from above, and leave
it running free on the frame.
• Lift up the frame, fit the frame slots onto the screws
up to the slot end positions.
• Tighten the two screws and fasten the other two screws
provided with the hood.
INSTALLING THE COOKER HOOD
13