Durr XR25 Manual de instruções - Página 10
Procurar online ou descarregar pdf Manual de instruções para Conversor de multimédia Durr XR25. Durr XR25 14 páginas. Film processor
12
13
14
60
F F F F F
E E E E E
F F F F F
E E E E E
5.6 Filling with chemicals
• Screw in red and black plugs (29), see right
fold-in page.
• Insert separating plate (13) between Fixer
tank „F" and Developer tank „E", black side
towards developer, red side towards fixer.
1.Filling up tank F-fixer (red):
• Pour in large red bottle A and top up with
cold water to the lower mark (14).
• Now pour in small red bottle B and top up
with cold water to the upper mark (15).
2.Filling up tank E-developer (black):
• Pour in large black bottle A and top up with
cold water to the lower mark (16).
• Now pour in small black bottle B and top up
with cold water to the upper mark (17).
• Take out separating plate (13), clean it and
store it.
• Replace bath (11), see fig.6.
5.7 Insert roller sets
see right fold-in page and fig.14.
• Firstly, lift all latches (25) ready to receive
roller sets.
• Insert roller sets. Secure all latches (25) and
catches (24).
5.8 Replace lid
see fig.2 (7).
The lid should fit easily. If not, check
that all catches (24) and latches (25)
are properly closed.
5.9 Making XR25 ready for use
• Insert mains plug
• Power switch (G) ON, see p.5.
Yellow indicator (D) lights up, warm up phase
begins (approx.20mins.) As soon as the
green indicator (C) lights up, the correct
temperature has been reached and the XR25
is ready for use.