Aqua Creek Products LIBERTY LIFT Instruções de instalação, montagem e funcionamento para o instalador - Página 6
Procurar online ou descarregar pdf Instruções de instalação, montagem e funcionamento para o instalador para Equipamento de iluminação Aqua Creek Products LIBERTY LIFT. Aqua Creek Products LIBERTY LIFT 15 páginas.
NEW CONSTRUCTION INSTALLATION: ANCHOR JIG ASSEMBLY
For new decks/construction install the supplied ANCHOR JIG ASSEMBLY as shown in the
figure below. The Anchor Jig Assembly must be installed parallel to the finished pool wall and
must be plumb and level with the top of the finished deck. If the deck is normally sloped keep
the area where the Anchor Jig is installed level and slope away from it. Bond the Anchor Jig to
the deck using the supplied grounding lug. Mask the tops of all 10 anchors before pouring the
concrete.
6