BilJax Pro-Jax Utility Scaffold Instruções de montagem - Página 2
Procurar online ou descarregar pdf Instruções de montagem para Equipamento industrial BilJax Pro-Jax Utility Scaffold. BilJax Pro-Jax Utility Scaffold 4 páginas. Building a one frame high scaffold
![BilJax Pro-Jax Utility Scaffold Instruções de montagem](/uploads/products/server2/293791/293791.jpg)
—
STEP THREE
braces B so that platform is fully seated within
inner channel on top of side braces.
PLATFORM
SIDE BRACE
—
STEP FIVE
Install 4 casters D into legs of end frames A and pin with snap pins E. Set brake
on each caster.
—
STEP SIX
(When recommended or required) When platform height exceeds 4 ft., guard
railing is recommended, but is not required. However, OSHA requires guard rails for all platforms
10 ft. or higher. Install each guard rail panel (2 required) into sockets in side braces B and secure
with lock pin. Be sure that guard rail gate swings inward over the platform.
GUARD RAIL PANEL
Panel Guard - 1 unit shown
(2 required per work level)
Unique design allows the guard railing to stay at the platform level at all times.
Guard railing does not fit on the frame but in the sockets on the platform brace.
Guard rail must be installed so that gate swings inward over platform. Failure to install guard
rail properly may result in serious injury or death!
• Recheck all side brace lock pins for full engagement and that the Saf-T-Lok
position before accessing platform.
• Recheck platform to be sure it is properly seated within side brace channel and the platform
clips are fully engaged before accessing.
• When accessing platform, climb over top of end frame ladder — do not swing around side
of end frame. Swinging around side of end frame will cause scaffold to tip over resulting
in serious injury or death.
Install platform C on side
CHANNEL
STEP FOUR
into the engaged position.
DISENGAGED
GUARD RAIL LEG
GUARD RAIL SOCKET
IN SIDE BRACE
WARNING
WARNING
- Page 5 -
—
Rotate the platform clips
ENGAGED
PUSH
®
is in the locked