Cisco 3020 - Cisco Catalyst Blade Switch Manual de iniciação - Página 24

Procurar online ou descarregar pdf Manual de iniciação para Interruptor Cisco 3020 - Cisco Catalyst Blade Switch. Cisco 3020 - Cisco Catalyst Blade Switch 31 páginas. Release notes for the cisco catalyst blade switch 3020 for hp, ciscoã‚â iosã‚â releaseã‚â 12.2(44)se
Também para Cisco 3020 - Cisco Catalyst Blade Switch: Manual de iniciação (37 páginas), Especificação rápida (12 páginas), Nota de lançamento (41 páginas), Nota de lançamento (27 páginas), Nota de lançamento (23 páginas), Nota de lançamento (21 páginas), Manual de instalação (21 páginas)

Cisco 3020 - Cisco Catalyst Blade Switch Manual de iniciação
CAB-STK-E-0.5M= (0.5-meter cable)
CAB-STK-E-1M= (1-meter cable)
CAB-STK-E-3M= (3-meter cable)
For switch module dimensions and additional stacking guidelines, see the switch module hardware
installation guide. For concepts and procedures to manage switch stacks, see the switch module
software configuration guide and the stack compatibility guide.
To create a switch stack:
Step 1
Install the member switch modules if you have not already done so.
Connect the StackWise Plus cables as described in the "Planning and Creating a Switch Stack
Step 2
(Only the Cisco Catalyst Blade Switch 3120 for HP)" section on page 23.
Step 3
Configure the member switch modules through the master switch by using the CLI.

Stack Cabling Configurations

This example shows a single chassis with two switches that create one stack. The stack uses the 1-meter
StackWise Plus cable to make redundant connections between two 3120 switches. Other types of
configurations are possible provided that you stack no more than nine switches. For more stacking
configuration examples, see the hardware installation guide.

Connecting the StackWise Plus Cables

Follow these steps:
Remove the dust covers from the StackWise Plus cables and store them for future use.
Step 1
Step 2
Verify that cables are aligned as shown in Figure 11.