Siemens SIPART PS2 Manual de instalação do hardware - Página 13

Procurar online ou descarregar pdf Manual de instalação do hardware para Equipamento industrial Siemens SIPART PS2. Siemens SIPART PS2 30 páginas. Mounting bracket kit
Também para Siemens SIPART PS2: Instruções de instalação (4 páginas), Manual de Instruções (28 páginas), Instruções de instalação (4 páginas), Descrição técnica (26 páginas), Instruções de funcionamento do Compact (35 páginas), Instruções de instalação do kit (9 páginas), Instruções de instalação (11 páginas)

Siemens SIPART PS2 Manual de instalação do hardware

Installing/mounting

3.1

Basic Safety Instructions

3.1.1

Improper Commissioning

Improper commissioning
These instructions are valid solely for the installation and commissioning of the Booster.
It is absolutely necessary that you follow the safety rules, notes and requirements of the
compact operating instructions before assembly, commissioning and also during operation
of the positioner. You can find the compact operating instructions on the supplied CD or on
the Internet under: http://www.siemens.com/processinstrumentation/documentation
(http://www.siemens.com/processinstrumentation/documentation)
High operating force with pneumatic actuators
Risk of injury when working on control valves due to the high operating force of the
pneumatic actuator.
• Please observe the corresponding safety instructions for the pneumatic actuator in use.
Lever for position detection
Danger of crushing and shearing with mounting kits which use a lever for position detection.
During commissioning and ongoing operation, severing or squeezing of limbs could occur
as a result of the lever. Risk of injury when working on control valves due to the high
operating force of the pneumatic actuator.
• Do not reach into the range of motion of the lever following mounting of the positioner
Venting Gauge Block Installation Instructions
Hardware Installation Manual, 12/2014, A5E34388399-AD
WARNING
WARNING
WARNING
and mounting kit.
3
11