3M 710 Manual de instruções - Página 6
Procurar online ou descarregar pdf Manual de instruções para Projetor 3M 710. 3M 710 20 páginas. Splicing rig
Também para 3M 710: Brochura e especificações (4 páginas), Especificações (4 páginas)
3.0 Straight Splicing using the 3M
3.1 Hold the handle to disengage the locked "T" bar
by turning the locking knob until the flat section
releases the "T" bar. Pull the "T" bar up and place
into the open position.
3.2 Set up the splicing rig on a support system with the
conductor group holders 1 1/2" (38mm) above the
cable group to be spliced.
3.3 Insert an index strip into the vertical side posts with
the cathedral windows facing the color code guide.
Push the "L" clip knob in to seat the index strip into
the channel and locate it under the "L" clips.
3.4 Secure a 25-pair group with the conductor group
holder. Dress the pairs into the index strip over
the colored peaks with the conductor ends exiting
towards the color code guide. Do not pull the
conductors tight to the back of the connector.
710 25-pair Modules
™
Flat
UNLOCKED
78-815-304--E