ASGCO BC-2 Instruções de instalação, operação e manutenção - Página 4

Procurar online ou descarregar pdf Instruções de instalação, operação e manutenção para Equipamento industrial ASGCO BC-2. ASGCO BC-2 9 páginas. With bolt-up tensioner system

ASGCO BC-2 Instruções de instalação, operação e manutenção
BC-2™ INSTALLATION
1. DETERMINE CLEANER LOCATION
Although BC-2 is a secondary cleaner and as such should be located on the return side of the belt after
the belt leaves contact with the head pulley, this system is designed that it will function at the
6 o'clock position on the pulley as shown below. Preferably it should be located within the confines of
the head or dribble chute.
Note that the bracket can be flipped either way to bolt
to existing structure. See Fig. 2.
Figure 2
2. CUTTING THE CHUTE OPENINGS
If the brackets are to be mounted to an enclosed chute, an elongated
hole will have to be cut into the chute wall to allow the mounting tube
to pass through from one side of the conveyor to the other.
See Fig. 3.
Figure 3
www.asgco.com
800.344.4000
2
|